
Scranton, PA · Electrical Transformer Buyers
We Buy Transformers in Scranton, PA
Scranton facility and construction teams call us when equipment is coming out and nobody wants to coordinate an electrician, a rigger and a hauler around one outage window. We are all three, and we pay you for the equipment on top of it instead of charging you to haul it away.
Same-day written offer
Get a Written Offer
Send the asset list, or just describe what is in the room. We come back the same business day with a written, itemized offer.
Faster: call 954-740-1983
Email an asset list to electricalequipmentbuyers@gmail.com
Mon–Sat, 7am–7pm ET. We never resell your contact information.
- Location
- Scranton, PA
- Desk
- Electrical Transformer Buyers
- Ratings
- 75 kVA – 50 MVA, oil-filled and dry-ty
- Offer
- Same business day
- Payment
- Before load-out
- Phone
- 954-740-1983
This city
Transformers buyers serving Scranton
Scranton sits in Pennsylvania, where PPL, PECO, Duquesne Light, FirstEnergy (Met-Ed, Penelec, Penn Power) feed the load and I-76 and the Pennsylvania Turnpike, I-78, I-79, I-80 and I-81 carry the freight. Sites near those corridors cost us less to service, and that shows up in your offer rather than in our margin. Philadelphia, Pittsburgh, Allentown, Erie and Scranton are routine stops and Scranton work routes with them.
The sequence is short. You send nameplate photos, a one-line diagram or just a list. We return a written itemized offer the same business day with a proposed removal window. On acceptance we survey access in Scranton — door widths, floor loading, dock, elevator, crane needs — then mobilize, lock out, disconnect, rig, load and sweep. Payment before the truck leaves.
| Item | Detail |
|---|---|
| Ratings | 75 kVA – 50 MVA, oil-filled and dry-type |
| Scope | Pad-mount, dry-type, cast coil, substation |
| Nameplates | ABB, General Electric, Square D, Eaton, Cooper, Howard, Federal Pacific, Siemens, Waukesha, Kuhlman, Westinghouse, Delta Star, Pennsylvania Transformer, Hammond, Acme |
| Condition | Working, retired, water-damaged or already dismantled |
| Minimum | One section, one unit, or a whole plant lot |
Equipment
What we take out of Scranton sites
Liquid-filled pad-mount and station class
Oil-filled pad-mount and pole-mount units, loop-feed and radial, unit substations with their primary switching and secondary sections, and station-class power transformers with tap changers, radiators and conservators. Oil is tested for PCB content before anything moves, and the manifests come with your paperwork.
Dry-type and cast coil
Ventilated dry-type and cast-coil units from 15 kVA through 5 MVA, including 480 V to 208 V step-downs, K-rated units specified for harmonic loads, and drive isolation transformers. Dry-types move easily, resell quickly and generally carry a strong number relative to their weight.
Pennsylvania specifics
Pennsylvania supplies the oldest and frequently the most valuable equipment we buy, because obsolete is not the same as worthless. The steel and coke legacy around Pittsburgh and up the Monongahela, the Lehigh Valley cement and steel corridor, and the anthracite-era industrial towns along I-81 left behind switchgear and busway from vintages nobody manufactures — which is exactly why plants still running that gear pay real money for sections and plugs. Philadelphia adds refinery and port infrastructure on the Delaware, a large hospital and university building stock, and mill buildings being converted throughout Kensington and Manayunk. Erie machinery, the natural-gas processing build-out across the northern tier, and continuous distribution replacement by PPL and Duquesne Light keep the flow steady. Pennsylvania is also where the Turnpike geography lets one crew work Pittsburgh and Philadelphia in the same week.
Nearby
Nearby and related
Nearby Pennsylvania coverage — crews serving Scranton also run to:
Common questions
Scranton questions
What happens to the equipment after you buy it?
Serviceable gear is tested, reconditioned where needed and resold as replacement equipment — that resale is what funds your offer. What cannot go back into service is dismantled for copper, aluminum and steel recovery through permitted processors, with regulated fractions documented.
Do you buy equipment that is still energized and in service?
Yes, and most of what we buy is. We quote it now and remove it on your cutover date. Telling us at the quote stage which Scranton assets are still live lets us build the phasing and the clearance coordination into the schedule from the beginning.
Our electrical room is in a basement with a tight door. Is that a problem?
It is routine. Switchgear sections, transformers and gensets frequently have to be cut down or partially disassembled to clear a door width, an elevator limit or a stair turn. The access survey at your Scranton site establishes the path before we commit to a date, and that cost is already inside the offer.
Will you take the equipment we cannot sell along with the good items?
Yes, and this is usually why sellers choose us. Cherry-picking leaves you holding the leftovers of the leftovers. We price the Scranton lot as a whole — good gear, obsolete gear and the scrap fraction together — so the electrical room ends up genuinely empty.
Do you provide documentation for surplus property or audit records?
Yes. Itemized purchase agreements, weight tickets, bills of lading, oil disposal manifests and recycling documentation are standard on Scranton purchases. Public agencies and audited facilities get the paperwork their process requires without having to ask twice.
Transformers in Scranton?
One call, one written offer, one crew. Payment before the trailer leaves.