Own crews · Own trailers · MA
Everett, MA Industrial Electrical Equipment Purchase and Removal
The electrical equipment in a decommissioned Everett facility is almost always worth more than a scrap yard will tell you. Medium-voltage breakers, copper-wound transformers, obsolete breakers and current-production panelboard interiors all resell into a working replacement market. We pay against that market and subtract our removal cost openly instead of burying it in the number.
Same-day written offer
Get a Written Offer
Send the asset list, or just describe what is in the room. We come back the same business day with a written, itemized offer.
Faster: call 954-740-1983
Email an asset list to electricalequipmentbuyers@gmail.com
Mon–Sat, 7am–7pm ET. We never resell your contact information.
- Location
- Everett, MA
- State
- Massachusetts
- Utilities
- Eversource, National Grid, Uniti
- Offer
- Same business day
- Payment
- Before load-out
- Phone
- 954-740-1983
This city
Buying electrical equipment in Everett
Massachusetts industry gives Everett projects a real secondary market close by. Massachusetts runs on conversion. The mill complexes along the Merrimack at Lowell and Lawrence, the Blackstone Valley around Worcester, and the Connecticut River corridor at Springfield and Holyoke are being turned into apartments, labs and light industry, and the electrical scope that comes out of a converted mill is often a century of accumulated switchgear, busway and transformers in one building. Add the biotech and lab build-out along Route 128 and in Cambridge, which retires perfectly serviceable switchboards and distribution gear on tenant-fit cycles rather than at end of life, plus the teaching hospitals and universities replacing emergency power systems. Municipal light departments are a real feature here — many towns own their distribution, so clearance procedures vary town to town and we plan for it rather than being surprised by it. Equipment that leaves your site frequently goes back into service within a few hundred miles of where we picked it up, and that is what lets us pay above metal value.
For Everett sites we quote two ways when it helps: a single number for the scope as it stands, and a line-by-line itemization showing what the switchgear, the transformers, the panelboards and the cable each contribute. Some teams need the lump sum to move an approval; others need the detail for their asset records. You can have both.
Equipment
What we buy in Everett
Fourteen categories. We buy every one of them at Everett sites.
Bus Plugs
Fusible switch and circuit-breaker plugs
30 A – 1,200 A fusible and breakerBus Duct & Busway
Feeder and plug-in, copper and aluminum
225 A – 5,000 A runsElectrical Switchgear
Low and medium voltage, indoor and outdoor
480 V – 38 kV, up to 5,000 AGenerators
Standby, prime and mobile sets
100 kW – 3 MW diesel and gasTransformers
Pad-mount, dry-type, substation, unit
75 kVA – 50 MVAPanelboards & Switchboards
Panelboards, switchboards, distribution
100 A – 4,000 AWire & Cable
Copper and aluminum, new and reclaimed
#12 AWG – 1,000 MCMCircuit Breakers
Molded case, insulated case, air, vacuum
15 A – 6,000 A framesMotor Control Centers
Low and medium voltage MCCs
MCC line-ups, buckets, VFD sectionsSubstations
Up to 138 kV primary
Complete unit and station substationsTransfer Switches
Automatic, manual, bypass-isolation
100 A – 4,000 A ATSCapacitors & Power Quality
Fixed and automatic capacitor banks
50 kVAR – 10 MVARComplete Plant Lots
One deal, one crew, one number
Whole-facility electrical scopeValuation
What drives the number
Sometimes the equipment value exceeds our removal cost and you receive a check. On older, stripped or badly access-restricted Everett scopes, the removal cost exceeds the value and the project nets near zero or a modest fee. You hear which one you are looking at up front rather than halfway through the teardown.
| Input | Detail |
|---|---|
| Condition | Working, retired, water-damaged, or already dismantled |
| Support | Are breakers and parts still available for this line-up? |
| Copper | Windings, bus bar and cable weight |
| Access | Rigging path, crane need, dock reality at the Everett site |
| Freight | I-90 and the Mass Pike, I-95 and Route 128, I-93 and I-495 |
Safety
Safety and documentation
Safety is scope, not a brochure page. Crews working in Everett operate to NFPA 70E for arc-flash boundaries and PPE, follow OSHA 1910.147 lockout and tagout with our own locks and written procedures, and hold a daily job safety analysis before the first bolt turns. We do not energize, test or operate your equipment — isolation is verified with your electrician before we touch anything.
Paper you receive
Certificate of insurance before we mobilize, a written itemized offer, a signed bill of sale, and load documentation for every trailer. If your compliance team needs something specific, ask before we schedule.
Nearby
Nearby cities and buyer desks
We cover the whole Massachusetts market, so if your equipment is not in Everett itself, one of these is probably closer:
Common questions
Everett questions
How fast can you get to a Everett site?
Written offers go out the same business day in nearly every case. After acceptance, typical mobilization to Everett is a few business days for a straightforward removal and one to two weeks for a full plant scope that needs phasing, rigging plans or utility coordination.
Do we have to disconnect the equipment before you arrive?
No. We handle removal. Your electrician or the utility performs the final isolation and we verify it; from there our crews lock out, cut and cap cable at the gland, unbolt the sections, skate them out and load them. If the Everett room is still partly live we phase the work.
How do you handle transformer oil in Everett?
Oil is tested, drained and manifested through licensed handlers, and you receive the documentation with your paperwork. PCB-suspect units go under a separate waste profile. Nothing is left on your pad in Everett and nothing gets dumped — the handling cost is already in the offer.
When do we get paid?
Before the equipment leaves your Everett dock. Wire, company check or cashier's check, whichever your accounting group prefers. On large phased projects we pay per load as it ships rather than holding everything until the end.
What if the equipment is old or has no test records?
We still quote it. Records raise the number — a NETA test report on a breaker or a transformer is the single document that most improves what we can pay — but their absence disqualifies nothing. We price Everett equipment on what our technicians and the replacement market say it is worth.
Are you insured to work inside our Everett facility?
Yes. We carry general liability, auto, workers' compensation and umbrella coverage, and we issue a certificate naming your entity as additional insured before crews mobilize to Everett. We also complete vendor onboarding, background checks and site-specific safety orientation on request.
Electrical equipment in Everett?
Photos of the nameplates are enough to start. Written offer the same business day.