Skip to content
Transformers strapped to a flatbed for load-out in New York

New York · Statewide

New York Electrical Equipment Buyers

We purchase switchgear, generators, transformers, substations, panelboards, breakers, MCCs and copper cable across New York, and we perform the de-energized removal ourselves.

Licensed and insured crewsPayment before load-outOffer in one business day

Same-day written offer

Get a Written Offer

Send the asset list, or just describe what is in the room. We come back the same business day with a written, itemized offer.

Faster: call 954-740-1983
Email an asset list to electricalequipmentbuyers@gmail.com
Mon–Sat, 7am–7pm ET. We never resell your contact information.

State
New York
Cities
98
Utilities
Con Edison, National Grid, NYSEG,
Corridors
I-87, I-90, I-95, I-84 and the Thr
Offer
Same business day
Phone
954-740-1983

Process

How New York jobs actually run

Utility territory matters here more than most owners expect: Con Edison, National Grid, NYSEG, Central Hudson, PSEG Long Island each have their own disconnect and metering process, and the sequence of who de-energizes what is usually the longest lead item on the schedule.

Freight is the other half. We route New York work along I-87, I-90, I-95, I-84 and the Thruway, which is what keeps trailer and crew cost predictable on a quote instead of padded.

New York is two completely different jobs sharing a state line. In the five boroughs and the lower Hudson Valley the work is vertical and permit-heavy: switchboards and busway risers coming out of pre-war commercial buildings, hospital and university plants replacing essential-power systems, and Con Edison network gear on a renewal cycle that never really stops. Freight elevators, night windows and street-level staging decide the schedule far more than the rigging does. Upstate is horizontal and industrial — the Buffalo and Niagara Falls electrochemical and metals legacy, Rochester optics and imaging plants that have been shedding infrastructure for two decades, Syracuse and Utica manufacturing, and the semiconductor and battery build-out that is now retiring the gear it replaced. Bus duct is unusually common in both halves, because so much of this building stock was wired when busway was the standard answer.

Primary hubs

New York City, Buffalo, Rochester, Syracuse and Albany — but coverage is statewide, including rural substation and mine sites.

Equipment

What we buy in New York

Bus Plugs

Fusible and circuit-breaker bus plugs by the unit or by the pallet — 30 A through 1,200 A, all major busway systems, any vintage.

30 A – 1,200 A fusible and breaker

Bus Duct & Busway

Plug-in and feeder busway runs, elbows, tees, end boxes and cable-tap sections — copper or aluminum, 225 A through 5,000 A, removed by our own crews.

225 A – 5,000 A runs

Electrical Switchgear

We buy low- and medium-voltage switchgear line-ups out of live plants, substations and buildings scheduled for demolition — metal-clad, metal-enclosed, drawout and fixed-mount.

480 V – 38 kV, up to 5,000 A

Generators

Diesel and natural-gas gensets from 100 kW through 3 MW — enclosed, open-skid, trailer-mounted and sub-base tank units, with or without their transfer switches.

100 kW – 3 MW diesel and gas

Transformers

Pad-mount, dry-type, cast-coil, unit substation and liquid-filled power transformers from 75 kVA through 50 MVA, including units still energized on the pad.

75 kVA – 50 MVA

Panelboards & Switchboards

Panelboards, switchboards, distribution panels, safety switches and disconnects — loaded with breakers or empty, one panel or a whole building's worth.

100 A – 4,000 A

Wire & Cable

Surplus and reclaimed copper and aluminum wire and cable — full spools, partial spools, off-spool coils and cable pulled out of cancelled jobs.

#12 AWG – 1,000 MCM

Circuit Breakers

Molded-case, insulated-case, low-voltage power and medium-voltage vacuum and air-magnetic breakers — single units, pallets and full sets pulled from a line-up.

15 A – 6,000 A frames

Motor Control Centers

Complete MCC line-ups, individual vertical sections, starter buckets and VFD sections — low voltage and medium voltage, any generation.

MCC line-ups, buckets, VFD sections

Substations

Complete unit substations and outdoor station equipment — primary switch, transformer, secondary switchgear, structures, bus and relaying, bought as one lot.

Complete unit and station substations

Transfer Switches

Automatic and manual transfer switches, bypass-isolation switches and paralleling gear, 100 A through 4,000 A, pulled with or without their generators.

100 A – 4,000 A ATS

Capacitors & Power Quality

Fixed and automatically switched capacitor banks, harmonic filters, reactors and power-factor correction equipment, indoor and outdoor.

50 kVAR – 10 MVAR

Complete Plant Lots

When a plant closes, we buy the entire electrical scope as one lot — substation to receptacle — and we do the teardown and loading at our cost.

Whole-facility electrical scope

Common questions

New York questions

Will you take the equipment we cannot sell along with the good items?

Yes, and this is usually why sellers choose us. Cherry-picking leaves you holding the leftovers of the leftovers. We price the New York lot as a whole — good gear, obsolete gear and the scrap fraction together — so the electrical room ends up genuinely empty.

Do you provide documentation for surplus property or audit records?

Yes. Itemized purchase agreements, weight tickets, bills of lading, oil disposal manifests and recycling documentation are standard on New York purchases. Public agencies and audited facilities get the paperwork their process requires without having to ask twice.

Do you actually buy electrical equipment in New York, or just broker it?

We buy it. Northeast Electrical Buyers is the purchaser of record — we fund the purchase, send our own crews to New York to disconnect and load, and take title when the equipment leaves your dock. There is no third party behind us waiting to approve the price.

What is the smallest job you will take in New York?

A single transformer, one switchgear section, a pallet of breakers or a few boxes of breakers is worth a call. Because we route crews across New York continuously, small New York pickups usually get added to an existing run rather than priced as a dedicated trip.

How fast can you get to a New York site?

Written offers go out the same business day in nearly every case. After acceptance, typical mobilization to New York is a few business days for a straightforward removal and one to two weeks for a full plant scope that needs phasing, rigging plans or utility coordination.

Equipment sitting in New York?

Send photos or a list. We reply the same business day.

954-740-1983

Mon–Sat, 7am–7pm ET · New York statewide

Get a Written Offer